03 / Solutions
Swimming Pools
A pool is the one element of a building under permanent water pressure — and that water is chemically treated. Chlorine and pH swings put the waterproofing under additional stress.
A two-component, flexible, chemically resistant cement-based system is preferred on the pool shell.
The fill test is run before tiling; a leak found after the waterproofing is covered means stripping the finish.
On permanently submerged surfaces the adhesive and grout are also specified from water- and chemical-resistant classes.
Related product families
Contact
Get in touch with us
Use the form for project, supply or partnership enquiries, or reach us directly through the channels below.
Get in Touch
